Home | SPECIAL OFFERS | Environment 2010 | Solar Heating | About us | Charges | What we do | Contact Us | Comments | Downloads & Technical
Updated of for Summer 2008 ONLY
 
For a limited time, we are offering the latest Worcester Bosch Greenstar 24i junior combination boiler supplied and fitted with a full 3 Year factory Warranty for just £1295.00+Vat
 
*Offer valid from 1st of July 2007, expires 20th September 2008
 
Features include:
 

  • A Rated Efficiency rating
  • Built in clock FREE OF CHARGE
  • 24kw (80,000 Btu output)
  • Compact dimensions - will replace all other Combi' boilers
  • WB3 series heatcell - robust cast aluminium/silicon construction
  • Heatronic III control system - sophisticated boiler management
  • 9.3 L/pm @ 35c rise hot water flow rate
  • Low NOx and CO2 emissions - environmentally friendly
  • Keep hot facility - instantly heated hot water
  • 3 YEAR FULL WARRANTY

To download the Greenstar 24i junior PDF guide click here

click here to download file

get_adobe_reader.gif
Don't have Adobe@ Click here to download it.

 
Combination boiler in need of replacement?
 
Check out this special offer!

flue_test_man.jpg

A brand new Worcester Bosch Greenstar 24i Junior combination boiler supplied and installed for only £1295.00 + Vat. We even take the old one away and recycle it!

wowsmall.jpg

Installation includes a standard horizontal (out the wall) flue kit. A vertical flue terminal will cost a little extra - please enquire.

boiler_on_wall.jpg

This price includes the Boiler, Flue, Clock/Programmer and all associated labour to install. If anyone can genuinely beat this price then we'll match it.
 

Upgrade to a Greenstar 28i Junior for just £99.00 extra + Vat
 
 
*Please note that due to recent changes in Building regulations Part P, we may have to carry out some small associated electrical work and testing in order to comply. This will be advised of when we survey your job. Electrical work will be charged as an extra. We will have to check the origin of the electrical installation and the presence of Main Equipotential Bonding to incoming services and extraneous parts as per BS7671, IEE wiring regulations 16th Edition, as well as other pre works inspections.